Aker Solutions Opens New Manufacturing Facility In Pickering, Ontario
Published: 15-Jun-2009
By: Staff Writer Staff Writer Staff Writer
Aker Solutions ASA (Aker Solutions), a provider of engineering and construction services, technology products and integrated solutions, has opened its new 90,000 square foot manufacturing facility in Pickering, Ontario, Canada. The new facility will allow Aker Solutions to capitalize on market demand for fabrication of its proprietary equipment for acid plants, by more than doubling its production capacity.
The original fabrication facility was established in Toronto in 1961, and has been designing and fabricating custom shell and tube heat exchangers and process equipment for the sulphuric acid, nitric acid, petroleum and chemical industries for nearly 50 years.
Gary Mandel, executive vice president of process & construction, Aker Solutions, said: As a result of our success as an industry leader in these niche sectors, we have re-located to this much larger facility, and implemented key equipment upgrades and manufacturing improvements to enable us to continue to meet market demand for our high quality, custom fabrication capability.
This new facility includes a 17,400 square-foot office, 17,000 square foot machine shop, and two 27,300 square foot assembly bays. The machine shop and assembly bays are equipped with a total of seven cranes, each with a span of 70 feet. Single lift capacity in one of the assembly bays is 100 tonnes. The facility provides higher and heavier lift capacity for larger equipment.
Integrating the Aker Solutions' comprehensive health, safety and environmental principles, the new facility provides improved workflow and ergonomics by eliminating congestion in work areas, more efficient energy usage, and built-in waste management systems.
Network Sites

Suppliers To This Sector
Browse A-Z
Addleshaw Goddard
Energy and Utilities UK Law Firm ...
Applus RTD
Non-Destructive Testing, Inspections and Asset Integrity Management ...
ATI Stellram
High-Performance Metal Cutting Tools ...
BBC Chartering
Break Bulk and Heavy Lift Shipping ...
Bea Technologies SpA
Filtration Technology ...
Beluga Shipping
Your Experts for Heavy Lift and Project Cargo ...
White Papers
Browse A-Z
Yokogawa Matures a Best Practice Culture for Successful Project Execution
Yokogawa is a world leader in the supply of control and instrumentation systems to process ...
Wind Power Cable Entry Solutions
With the Roxtec sealing system for cables and pipes, the wind power industry has a standar ...
Why Our Float Magnetic Field is Superior
The factory preaches, "Jerguson has the strongest magnetic circuit on the market"…but why? ...
Valves for the Solar Industry
The solar industry has impressed us with a breathtaking annual growth rate of 40% over the ...
Utilising the Possibilities of IEC 61850 and GOOSE
This document describes the utilisation of some new features offered by IEC 61850, Communi ...
Upstream Safety 2010
Two day conference aligning people and processes for safe operations. Unrivalled networkin ...


Delicious
Digg
Reddit
Stumble
LinkedIn
Mail sent successfully